overlay-equipment

Features & Equipment

650 MM MAIN BROOM WITH 6 V-SHAPED BRISTLE ROWS
1050 MM WIDE SWEEPING PATH WITH 2 SIDE BROOMS
450 MM NYLON SIDE BROOMS
230-MM DIAMETER VACUUM IMPELLER
1 POLYESTER CLASS S BAG FILTER
ELECTRIC FILTER SHAKER
FLASHING LIGHTS
63 LITRE TOP LOADING DEBRIS HOPPER
FORWARD/REVERSE HYDROSTATIC DRIVE
REAR WHEEL DRIVE THROUGH DIFFERENTIAL
SOLID STEEL FRAME REINFORCED AT ALL STRESS POINTS
WET SWEEP OPTION STANDARD
DUST CONTROL TO 3 MICRON
QUICK DISCONNECT FILTER
HIGH GLOSS EPOXY RESIN FINISH
Background

ASC Eureka M2 TECHNICAL DATA

Main Brush Width mm 650
Total Sweeping Path mm 1050
Maximum Cleaning Capacity sq.mt/hr 5486
Hopper Lt. 63
Power Source - Battery
Bag House Dust Filter - Standard
overlay-equipment

Features & Equipment

650 MM MAIN BROOM WITH 6 V-SHAPED BRISTLE ROWS
1050 MM WIDE SWEEPING PATH WITH 2 SIDE BROOMS
450 MM NYLON SIDE BROOMS
230-MM DIAMETER VACUUM IMPELLER
1 POLYESTER CLASS S BAG FILTER
ELECTRIC FILTER SHAKER
FLASHING LIGHTS
63 LITRE TOP LOADING DEBRIS HOPPER
FORWARD/REVERSE HYDROSTATIC DRIVE
REAR WHEEL DRIVE THROUGH DIFFERENTIAL
SOLID STEEL FRAME REINFORCED AT ALL STRESS POINTS
WET SWEEP OPTION STANDARD
DUST CONTROL TO 3 MICRON
QUICK DISCONNECT FILTER
HIGH GLOSS EPOXY RESIN FINISH

Asc clients using this machine

ICE Inter Capital Express Vic

Updated on Thursday, April 22, 2021

ICE Inter Capital Express Vic

The Client Inter Capital Express are a 3rd generation freight company. They area a known national provider and award winning Express Freight Service. The Challenge. The company had a huge dust problem in their warehouse. Dust was blowing into their warehouse from outside and suffered from forklift Tyre and brake

Read More
Raytheon Australia Acquire ASC Eureka M2

Updated on Thursday, April 22, 2021

Raytheon Australia Acquire ASC Eureka M2

The Client. Raytheon Australia are technology company supplying to the Australian Defence Force. The Challenge Raytheon’s new facility at Mawson Lakes in SA had a lovely painted floor and the staff there want to keep it that way. ASC’s Ken Pepyat was asked to guide the company through the ASC

Read More
Barry Leahy Engineering Says Goodbye to Factory Dust

Updated on Monday, January 25, 2021

Barry Leahy Engineering Says Goodbye to Factory Dust

The Client Barry Leahy Engineering a construction company based in Howlong NSW. The Challenge. Dave Leahy (Director) contacted ASC’s Ken Pepyat recently to discuss a solution to eliminate his companies very dusty factory floors. Shortly after, Ken organised to demonstrate the ASC Eureka M2 out in rural Howlong. (Albury NSW).

Read More